News
Salicru has supplied different SLC ADAPT2 units for this infrastructure, and is providing technical training on the use of the equipment. These UPS will be essential in protecting the interlock, signalling and control systems over the 1,500-plus kilometres of rail track between Chiapas and Yucatán.
The Salicru SLC ADAPT2 modular Uninterruptible Power Supplies (UPS) perform their functions in the protection of interlock, signalling and control systems. These solutions have been implemented in many different railway projects, from commuter to high-speed rail lines, and minimise the risk of faults to ensure continuous and reliable operations.
The recent technical training ensures the personnel of the ALSTOM GROUP, the company that is to manage and maintain the equipment, are entirely familiar with the solution.
The Maya Train is one of the most important infrastructure projects in Mexico, designed to boost economic and tourist development in the south east of the country. The route of the train covers five states and will improve regional connectivity, fostering sustainable tourism and creating employment in local communities.















MONTAWEB.com